Permit and decisions · PLAN-A
2018 historical permit
Historical 2018 permit from the agency production. Its conductivity table states three samples per week; the 2026 issued table states one per week. Other parameters require separate comparison. Permit terms are not measured discharge results.
Source pages 100–139 · 40 source pages · Selected records
About this selection
These pages come from the 688-page TCEQ production for the Southwest wastewater plant. Page labels below identify the original production; selected source images and existing redactions are preserved.
Reading context and source notes
Historical permit reproduced from the reviewed agency production.
One handwritten signature image is masked on source page 100.
Dates, substantive terms, role labels, tables and blank forms remain.
The 2018 conductivity table says 3/week; the 2026 table says 1/week.
Historical conditions are not measured performance or current findings.
Conductivity corrected: 2018 source 101 is 3/week; issued 2026 source 61 is 1/week. Other parameters require separate comparison. Historical limits are not measured results or present-condition findings.
Jump to a source page
Related records
Compare the 2018 and March 2026 terms with the existing Southwest excerpt and the separate City Southside permit. EPA monitoring results and the September 2026 order concern identified reporting periods; requirements, reported results and settled allegations are different evidence. The issued record’s 94%/98% WET discrepancy remains visible.