Southwest plant issued permit and action notice
Permit issued March 20, 2026, with the March 27 action notice, as contained in the agency production. The issued-permit WET heading on source 62 says 94%, while its rows/footnote and printed page 20 use 98%. Preserve both; do not silently select one value. Requirements are not measured performance.
Source pages 5–6, 60–99 · 42 source pages · Selected records
About this selection
These pages come from the 688-page TCEQ production for the Southwest wastewater plant. Page labels below identify the original production; selected source images and existing redactions are preserved.
Reading context and source notes
The two-page English action notice is followed by the complete 40-page permit, including printed pages 1–38 and pages 2a and 2b, all conditions and blank biomonitoring forms.
The signed permit was issued March 20, 2026. The March 27 notification identifies that effective action date. It states that it replaces the November 19, 2018 permit; the January 21 response to comments appears in TCEQ-WW04.
On source page 62 (printed page 2a), the fathead-minnow lethal-toxicity heading says 94%; the rows and footnote 7 say 98%. Printed page 20 also says 98%. The selection preserves the discrepancy without choosing a corrected requirement.
Official signatures and page numbering remain. No content redactions were needed on these selected pages. Permit terms do not establish subsequent compliance or later amendments.
Jump to a source page
Related records
Compare the 2018 and March 2026 terms with the existing Southwest excerpt and the separate City Southside permit. EPA monitoring results and the September 2026 order concern identified reporting periods; requirements, reported results and settled allegations are different evidence. The issued record’s 94%/98% WET discrepancy remains visible.