THE PAPER TRAIL · Reviewed permit records

Application and supporting records · PLAN-D

Applicant chemical-use summaries and laboratory assignments

Applicant chemical-use summaries and laboratory assignments submitted with the application. These are qualified applicant estimates and assignments, not measured effluent results or verification of current use, accreditation or chain of custody.

Source pages 675–676, 678 · 3 source pages · Selected records

About this selection

These pages come from the 688-page TCEQ production for the Southwest wastewater plant. Page labels below identify the original production; selected source images and existing redactions are preserved.

Reading context and source notes

Three complete sheets: chemical-use summaries (675-676) and laboratory assignments (678).

Approximate quantities, less-than qualifiers, units, missing-data labels, supplier attribution and complete parameter tables retained.

No privacy masks were needed. The laboratory sheet lists organizational addresses and phone numbers, without named individual contacts.

Chemical-use tables are historical applicant statements, not measured effluent composition or a verified current inventory. Blanket bioaccumulation labels do not replace qualified SDS data.

Laboratory assignments do not establish collection dates, results, accreditation or chain of custody. Earlier sample-date discrepancies remain unresolved.

Jump to a source page

Related records

The application, models, sampling-waiver correspondence, maps and photographs explain what was submitted and reviewed. Compare them with the issued terms and separately dated monitoring records. An application-sampling waiver is not a waiver of routine permit monitoring; models, applicant estimates and source captions do not establish measured performance or current conditions.

Agency production · source page 675 · source image 1 of 3
Agency production · source page 675 from PLAN-D
Agency production · source page 676 · source image 2 of 3
Agency production · source page 676 from PLAN-D
Agency production · source page 678 · source image 3 of 3
Agency production · source page 678 from PLAN-D