Application and supporting records · PLAN-L
Captioned photographs
Captioned facility and receiving-water photographs with their attachment dividers. Captions are source assertions; receipt stamps do not establish photograph dates. Visible foam does not establish its chemical identity, cause or compliance significance.
Source pages 470–471, 686–687 · 4 source pages · Selected records
About this selection
These pages come from the 688-page TCEQ production for the Southwest wastewater plant. Page labels below identify the original production; selected source images and existing redactions are preserved.
Reading context and source notes
Four complete source pages (470-471 and 686-687): both attachment dividers and both photo sheets. The two nonconsecutive groups remain explicitly identified. No privacy masks were needed.
Attachment B contains two facility photographs with an applicant caption about concrete basins, their asserted age and historic buildings. These are source assertions, not independently verified construction dates or historic-status findings.
Attachment H labels one photograph downstream and one upstream of discharge. The downstream image shows white surface foam; appearance does not establish its chemical identity, cause, compliance status or current conditions.
The May 1, 2023 receipt stamp is not a photograph capture date. Photograph dates and present accuracy are unestablished.
The original framing, captions, colors and scan defects are retained. This does not establish separate SPIF submission or change any other photograph hold.
Jump to a source page
Related records
The application, models, sampling-waiver correspondence, maps and photographs explain what was submitted and reviewed. Compare them with the issued terms and separately dated monitoring records. An application-sampling waiver is not a waiver of routine permit monitoring; models, applicant estimates and source captions do not establish measured performance or current conditions.



