Skip to profile
AN INDEPENDENT CASE STUDY Mount Pleasant, Texas
← Back to Who’s Who?
Editorial illustration of a house and magnifying glass over an abstract parcel map; symbolic imagery for Titus Central Appraisal District.
EDITORIAL ILLUSTRATION

County / ORGANIZATION IN THE RECORD

Titus Central Appraisal District

Property appraisal district

Titus Central Appraisal District

Linked record period: May 1, 2023 – Sep 2, 2025

WHY THIS PROFILE IS HERE

Role in the paper trail

Correspondence asks the City to reconcile Walmart permit values. Appraisal and permit information are presented with their distinct purposes.

SOURCE HISTORY

The same City permit report, two CAD source descriptions

The CAD entries retain two useful descriptions of the same three-page file: internal forwarding of the City’s March 2026 permit information, and the Walmart electrical and concrete permit entries in that exchange.

Source check. The complete files are byte-for-byte identical. Both record IDs, source-file references and caption contexts are retained.

Scope. This is one file with two catalog descriptions. It does not establish a second permit event or a new finding about project compliance.

CHRONOLOGY

Key dates & context

  1. Source record

    TCEQ application links City ownership and Pilgrim’s operation of Southwest WWTP

    The application identifies the City as owner of the facility and land and as co-applicant with Pilgrim’s Pride. Attachment A contains their 1988 Operating and Permitting Agreement, including Pilgrim’s operating obligations, City approval of capital improvements over $100,000, debt-service reimbursement, other customer connections, and a permit-transfer provision.

    Context, limits & source references

    The cited application and agreement establish their stated terms. They do not establish whether the agreement was later amended, what payments are current, or the outcome of a particular records request. The Southwest plant is distinct from the Southside plant.

    • TCEQ technical package WQ0003017000 — PDF pp. 96, 101, 173–180; agreement signed May 4, 1988, effective June 1, 1988
    • City wastewater budget excerpt — PDF p. 1, DRAFT watermark; FY26 archive label
    • Titus CAD property 9270, 664 FM 127 — January 18, 2026 snapshot, PDF p. 1
  2. Source record

    The supplied permit list and history need to be read together

    The City’s list shows permit 24-0156, construction value $1,023,210, fees $5,704.97 and a paid date of April 24, 2024. The list header says “APRIL 2023–2024,” while Ankrum’s email describes April 2023. The manager history also shows an earlier permit-number change and a payment-field change from $5,704 to zero. The manager history names Eric King on the November 29, 2024 initial import and Zach Ringlein on December 9 updates. It also records later HS GovTech REST API activity.

    Context, limits & source references

    The date labels and payment-field history differ. The supplied fields alone do not establish a refund, nonpayment or waived fee; the payment ledger would be needed to resolve those questions. The HS GovTech agreement includes data conversion and technical support, providing a documented support route to examine alongside the later old-system explanation. The logs identify named accounts and system actions; they do not prove that all older records could be recovered.

    • Titus CAD production: permit list from John 9.2.25, page 1; manager record, pages 1–2; discrepancy chain, pages 1–3
  3. Source record

    CAD asks the City to reconcile $19.63 million with a $1.02 million application

    In the September 2, 2025 email chain supplied by Titus CAD in August 2026, Dickerson asks Ankrum to reconcile CAR25958’s $19,633,400 construction value with the application’s $1,023,210. Ankrum confirms the lower value, says the old-to-new-system import left some things “jumbled,” and later says HS GovTech changed the permit number for a reason he does not know. The manager history records the September 2 valuation, status and description changes.

    Context, limits & source references

    The field is permit construction value, not the CAD tax appraisal. This evidence does not establish a tax reduction or that the correction itself was improper.

    • August 10, 2026 Titus CAD production: discrepancy email chain, pages 1–3; building permit manager record from John, pages 1–2; application, page 1

Source notes

Symbolic editorial illustration; imagined objects and buildings, not official insignia or documentary evidence.

This profile is drawn from the case study’s reviewed chronology and correspondence index, through September 21, 2026. Roles identify the capacity described by the linked material; the date range is not a verified employment term.

Source statements, transcript excerpts, reported concerns, historical comparisons and timing analysis retain their separate labels. An invitation does not prove attendance. A copied recipient does not establish agreement or action. A call-number match does not establish call content.

Editorial portraits are illustrations, not documentary photographs. Original documents and recordings control over the profile summary. About the method ↗